The Big Three Challenges for utility-scale ground-mounting 2016-11-27


As the saying goes, the best time to solve a problem is before it happens. This is especially true at utility-scale projects sites, where installation delays due to avoidable problems can become extremely expensive. Based on years of experience, one vice president of engineering at famous solar mounting manufacturing company,identified three mounting-installation areas that encounter most delays and redos. In a recent Solar Power World webinar, he identified strategies for overcoming these challenges.


solar ground mounting system


Challenge No. 1: Insufficient Risk Management
Everyone involved in the value chain of a solar power facility is exposed to varying levels of risk. Risks include considerations of site access and ground surface adjustments, vegetation control, climatic influences, material supply, political stability and, of course, design of the installation itself. The goal of diligent risk management is to mitigate or at least limit potentially costly issues and delays during the construction and production phase of a project.

Project Management and Communication

One big step in the right direction with regards to managing project risk is good communication among stakeholders during the design and construction phase of a project. If all communication counterparts are known and familiar with each other, issues can be addressed expediently and without high impact on project cost.


Challenge No. 2: Poor or No Geotechnical Testing
Geotechnical testing at project sites helps determine the best system type for a project, ensures a reliable foundation is used and lets contractors achieve the most efficient use of materials. When testing is not up to par, the consequences can range from delayed installation to a faulty or unsafe project. Major problem areas in geotechnical testing are commonly found in determining proper foundations and embedment depths.

Site access and preparation is of utmost importance prior to geotechnical investigations. If a project site will be significantly modified after testing is completed, the results may be invalid and testing may have to be redone. Sites should be tested in a grid pattern to maximize the potential to capture subsurface issues ahead of time, solar panel mounting system.

An important element of soil testing is to assess corrosion potential, which can often be a costly issue for any installation, especially on large utility-scale projects. When corrosive soils are found, mitigation measures have to be developed in the affected area.

Embedment depths
Designing a structurally and geotechnically sound foundation should be at the forefront of any engineering team reviewing a site. For clients and owners of utility-scale power plants, the durability of the mounting system can either create a long-term liability or be something they rarely have to consider.

In addition to the longevity and performance of the mounting system, the embedment depth influences the cost of the mounting systems directly, as posts are generally quoted by the meter or foot by most manufacturers. Optimizing embedment depths aides in creating a cost-effective design.


Challenge No. 3: Lacking Cost-Effective Designs
Structural safety, cost control and design and sustainability are three key areas to consider when setting design criteria and goals. There are certain fixed parameters that are beyond the control of any developer, such as environmental loads (wind, snow and seismic) and characteristics of landscape (geometry, soil conditions, exposure category). Additionally, the module selection—framed or frameless—can also play a large part in the racking design. When working with a mounting manufacturer, small configuration adjustments in inclination angle and string sizes can add up to great savings.

Structural safety
From an engineering and design perspective, the longevity of the system is most important. Building codes and local regulations must be taken into account to put stakeholders at ease with the system design. Areas to consider before selecting a utility-scale mounting system include adjustment capabilities of the system in the field, which is often needed when rammed foundation posts are not installed exactly as specified in the construction documents.

Cost control
When it comes to cost control measures, there are three main areas of concerns: material use, logistics and installation time and requirements. Most utility-scale systems today are manufactured using steel. While aluminum is still an option, cost considerations generally steer developers away from it. When shipping the system, it’s important it arrives in a fashion that reduces site work as much as possible. Because work on a construction site is prone to weather and other delays, it is important to reduce installation times as much as possible.

Design and sustainability

As the solar industry ages globally, the topic of end-of-design-life is gaining importance. In many cases systems have to be built back and material scrapped. Depending on the foundation system, large concrete foundations may have to be excavated. In other scenarios, steel supports may have to be removed at a much lower cost.



热门产品
  • 太阳能建筑一体化

    太阳能建筑一体化

    阳光支架- 建筑一体化是带有防水功能的几乎适合所有建筑物安装的一体化解决方案。拥有创新设计的轨道,防紫外线橡胶,橡胶卡块及挂钩,阳光支架建筑一体化系统已经成为世界上应用最广泛的建筑一体化支架安装系统。给世界范围的安装者高效及高性价比的体验

  • 压载式平屋顶太阳能支架

    阳程阳光平屋顶压载式太阳能支架系统

    阳光支架-平屋顶压载式是款用于将太阳能板形成阵列固定在平屋顶上而不破坏屋顶的优秀的工程方案;它适用于市场上硅晶太阳能板和薄膜太阳能电池板并且无需对屋顶进行钻孔作业。

  • 单根立柱光伏支架

    单根立柱式太阳能地面支架系统

    阳程新能源有限公司研发了一系列太阳能立柱支架,安装板数根据客户需求从一块板到十块板都有标准的立柱支架产品。如果您需要安装更多的板数,请联系阳程我们将为您定制符合您工程需求的立柱支架系统。

欢迎来到 Sunforson
如果您有任何问题或建议,请给我们留言,我们会尽快回复您!
   

在线联系

首页

产品

关于

联系